Series: | ETR 500 | ||
Batches: | 31-60, Y2 | 1-30, Y1 | 39,54,58,60 |
Builders: | Trevi | ||
Build: | 1999−2001 (30) | 2004−2007 (32) | 2004−2007 |
Top speed: | 300 km/h | ||
Formation: | 13 cars (2M11T) | 10 cars (2M8T) | |
Gauge: | 1435 mm | ||
Train length: | 327.6 m | ||
Weight: | 598 t | ||
Electric systems: | 3 kV DC 25 kV AC 50 Hz | 1.5 kV DC 3 kV DC 25 kV AC 50 Hz |
|
Power output: | 8800 kW |
||
Comments: | E.404.501-559 | E.404.601-664 | ETR 500 F |
Source: | en.wikipedia.org, www.leferrovie.it |
FS ETR 500 | Italian State Railways | 48 | |
MIR ETR 500 | Mercitalia Rail | 1 | |
RFI ETR 500 D | Rete Ferroviaria Italiana | 1 | |
RFI ETR 500 Y | Rete Ferroviaria Italiana | 3 |