68027 is one of nine to be delivered of which it will be noticed has a more simple livery. These nine are to be sub-leased to TransPennine Express and will work passenger trains in the north of the UK during the next year. |
Series: | Eurolight |
Build: | Vossloh 2013 |
Top speed: | 160 km/h |
Gauge: | 1435 mm |
UIC axles: | Bo'Bo' |
Length: | 20.32 m |
Height: | 4.26 m |
Weight: | 85 t |
Axle load: | 21.4 t |
Prime mover: | Caterpillar C175-16 |
Power output: | 2800 kW |
Tractive effort: | 317 kN |
Source: | en.wikipedia.org |