SLSF Bridge Crane BC-001 is driving one of the two "quarter" pilings (the inside pair), while the outer two "batter" pilings have already been driven "to refusal" (will not go in any further) and cut off to the proper height. This is the main line of the Fort Worth & Denver Railway, a subsidiary of Burlington Northern, so the bridge crew has a .. More |