Electric train ET2A (right) was the first electric train with asynchronous traction engines for the post-Soviet period. It was built in 1999 at the Torzhok Carriage Works (TorVZ) and was sent to the VNIIZhT testing ground in Shcherbinka. It is unique, as it is built in a single instance and there are no more electric trains with this design op .. More |