pic

UP C45AC/CTE 7662flagPalemon MO Palemon

UP 7662 East gets a big hook to replace the "frozen" front axle.

options icon
©  Jan 28, 2022


published
views

1,4K

likes

17+1


NIKON D850

Exposure: 10/16000
Aperture: f/7.1
Focal length: 85 mm
ISO: 500
Time: 15:27

UP 7662 East gets a big hook to replace the "frozen" front axle.



storyThis UP trackage rights train snarled BNSF Main 1 for several hours while Cranemasters came out from Kansas City to replace the front axle of the lead bogie, which had frozen and was dragging. As a result, traffic was diverted over Main 2 in fleets, four west and then four trains eastward during the work seen above. The replacement took only about an hour - these guys really knew what they were doing. In this view, the front wheelset with the bad traction motor has been dropped and the replacement wheelset is seen at far right, next to the orange dude. This produces a new wheel arrangement for Trainspo, given that the loco was formerly a C-C, and is now (temporarily, at least) a 1B-C, until it can get a new traction motor axle at Chicago, North Platte or North Little Rock shops.
Good shot! Very interesting moment!
@Ilia.Obuhov.52
Thanks! Always neat to watch big machines in action!
Big machine -> big price for repair.
P.S. Interesting photo, thanks
@ALeventiy
Thanks!
Yes. Railroading on any scale is exorbitantly expensive.
Please log in to your account or sign up to like this picture or leave a comment