pic

EVR C36-7i 1504flagAegviidu Aegviidu

Head-on collision between freight train and EMU

options icon
©  Dec 23, 2010


published
views

515

likes

12


Scanned with a SP-1500

Head-on collision between freight train and EMU



This accident occurred on the early morning of Dec 23, 2010. Passenger train that was supposed to wait until morning to take passengers to the capital was started in the middle of night and ran through switch straight toward oncoming freight train. It was suicide by the train driver. Speed of the empty passenger train at the moment of the accident was about 70 km/h, and freight train was travelling at about 30 km/h. First wagon of ER2 class electric train was completely blown into smithereens. It just shows how poor is the construction of soviet era passenger trains. Of course train driver of the electric train was killed and his body was later found smashed under all of this pile. However driver and conductor of the freight train were fine, they just threw themselves to the floor of the locomotive cab. That’s how strong is the construction of American freight locomotive, it was not even thrown off the tracks, whereas wagons behind locomotive were. Collision happened few kilometres west of Aegviidu station. You can see some of the aftermath here: https://tv.delfi.ee/artikkel/67220184/aegviidu-rongionnetus
@rl
Hmm .. I didn’t quite understand the statements about the poor design of Soviet-era trains. The ER2 had a common design flaw in the body - the absence of a body frame reinforcement. It was a disease of all electric trains of the ER series, when, for example, as a result of a collision, the first head car broke in half near the first passenger doors. ER2 was designed back in the 60s (and the progenitor of ER1 even earlier), when in world practice such technologies as they are today have not yet been introduced on rolling stock. But the fact that ER2 is just a rotten electric train as of 2010 also played a role in the accident in the photo. In ER2, structural steel was used, which by this time had rusted so much on all cars in the CIS that sometimes cracks could be seen in the body. In addition, ER2 is hollow inside because of the interior. But this is not poor build quality, but just time and the supporting structure of the electric train. The C36-7i has a completely different design and a reinforced frame, on which the engine, cab and other equipment are installed in a modular way (and the C36 is corny many times heavier than one ER2 car). If at such a speed ER2 collided with the same CHME3 or TEM7, the effect would be approximately the same - a rotten body at a speed of 70 km/h crashes into a locomotive at a speed of 30 km/h, where a solid frame is installed. By itself, the electric train is simply mounted on a diesel locomotive in this case.
There is an interesting documentary film, where such cases are described in world practice, when the structures of cars similar to ER2 were simply torn apart when colliding with more massive equipment, and then reinforcements were used in the body frame with absorption in case of impacts, crash systems, like this now on Stadlers it is installed under the driver's cab (so that the cars do not overlap each other in the event of an accident). So the claim about the poor design of the ER2 is unfounded.
Please log in to your account or sign up to like this picture or leave a comment