Working in diesel engine mode the catenary is still to be installed in this section The civil engineering work taking place is to stabilize the embankment |
Family: | A-train | |||
Batches: | 800/0 | 800/1 | 800/2 | 800/3 |
Build: | Hitachi 2015 | |||
Formation: | 5 cars (3M2T) | 9 cars (5M4T) | 5 cars (3M2T) | 9 cars (5M4T) |
Gauge: | 1435 mm | |||
Car length: | 26 m | |||
Width: | 2.7 m | |||
Electric systems: | 25 kV AC 50 Hz |
|||
Source: | en.wikipedia.org, ja.wikipedia.org |