pic

UP AC4400CW 6848flagPalemon MO Palemon

UP 6848 East utilizes trackage rights on NS/BNSF to Chicago.

options icon
©  Jun 4, 2022


published
views

549

likes

13


NIKON Z 9

Exposure: 10/16000
Aperture: f/6.3
Focal length: 110 mm
ISO: 500
Time: 14:46
GPS: 39.3226 -93.5873
1171K 1920x1280

UP 6848 East utilizes trackage rights on NS/BNSF to Chicago.



Is there a limit on how many locos they can run together?
@Kempy72 - Not really. In recent practice, however, locos are not necessarily all online in such consists unless topography along the planned route warrants using extra power. Computerized "Trip Optimizers" now make such decisions in many cases. On the really large power shuffles with all locos (up to 12 or even more) and no trailing freight, only a few locos are likely to be active in the string. The only practical limit to operational power in such large consists is the strength of the couplers vs. the weight of the train being pulled. Distributed power is what has made the idea of two-and-three-mile-long freights feasible, reducing the stress of excessive power at the front of the train. The train above was a minimum of two miles long, and had two more units as DPU power assisting farther back.
Wow, that’s a lot of motive power!
Please log in to your account or sign up to like this picture or leave a comment