Builder: Bombardier Flexity outlook Details : n operation in Linz, Austria, and Lodz, Poland. Each tram is capable of carrying 159 passengers, with 58 seated, and the complete network is designed to carry approximately 170,000 passengers per day. The vehicles will operate in a mixed traffic system at a top speed of 50 km/h, although they are capable of reaching speeds up to 70 km/h. Source : http://www.bombardier.com/en/transportation/products-services/r..90126
Facebook
Twitter
Google+
Pinterest
Please log in to your account or sign up to like this picture or leave a comment
Details : n operation in Linz, Austria, and Lodz, Poland. Each tram is capable of carrying 159 passengers, with 58 seated, and the complete network is designed to carry approximately 170,000 passengers per day. The vehicles will operate in a mixed traffic system at a top speed of 50 km/h, although they are capable of reaching speeds up to 70 km/h.
Source : http://www.bombardier.com/en/transportation/products-services/r..90126