The metal tubes yet to be fully driven into the ground. They are for mounting the overhead catenary poles and the associated structures in preperation for full electrification operating the new IEP Class 800 multiple units.
Facebook
Twitter
Google+
Pinterest
Please log in to your account or sign up to like this picture or leave a comment